Home › HRMS › Org structures › EPC company org structure
Org structure

How an EPC company is structured

An EPC company, say an 800-staff engineering, procurement and construction contractor in Vadodara building plants and infrastructure, is organized around large projects. A managing director leads. Engineering designs, procurement buys equipment and material, and construction builds on site, with a project manager tying the three together for each job. Tendering wins the work, quality and safety protect it, and finance and HR support it. Teams are split between the head office, where engineering and procurement sit, and project sites, where construction runs, so two working environments exist inside one company.

Org chart

Managing DirectorProjects HeadProject Managerper projectConstruction ManagerSite EngineerPlanning EngineerEngineering HeadDesign EngineerProcurement HeadProcurement EngineerTendering HeadEstimation EngineerQA and Safety HeadSafety OfficerHR ManagerFinance Manager

The project site branch is shown in depth, from the projects head to a project manager and the construction, site and planning engineers. Engineering, procurement, tendering, quality and safety, HR and finance are drawn one level down. Head office and site teams work in different environments.

Levels and designations

LevelTypical designationsSpan of control
L1 LeadershipManaging Director, CEO6 to 8 heads
L2 Function headsProjects Head, Engineering Head, Procurement Head, Tendering Head3 to 6 reports
L3 Project leadershipProject Manager, Construction Manager, Lead Engineer6 to 20 staff
L4 Engineers and officersSite Engineer, Planning Engineer, Procurement Engineer0 to 10 staff
L5 Site staffSupervisor, Foreman, Draughtsmanno direct reports

Approval chains

RequestApproval chain
LeaveSite Engineer → Project Manager → HR Executive
Attendance correctionDesign Engineer → Engineering Head → HR Executive
OvertimeSupervisor → Construction Manager → HR Executive
ReimbursementSite Engineer → Project Manager → Finance Manager
HiringProject Manager → Projects Head → HR Manager

How the structure works

The three letters, engineering, procurement and construction, are the three main functions, joined for each job by a project manager. Engineering produces designs, drawings and specifications from the head office. Procurement sources equipment, bulk material and subcontractors against those specifications. Construction executes on the project site through a construction manager, site engineers for civil, mechanical and electrical work, and supervisors leading contract labour. A planning team tracks schedule and cost against the plan. Tendering estimates and bids for new work, quality and safety hold standards, and finance manages project cash flow. The project manager owns delivery and coordinates all functions for that job.

How it changes with size

A small contractor may run one project at a time with a project manager, a few engineers and hired labour. A mid-sized EPC firm runs several projects together, with head office engineering and procurement serving all of them, and a planning desk. A large contractor builds business units by sector, such as power, water or roads, each with its own projects and engineering, plus central procurement, a dedicated safety department, and a proposals team for big tenders. Head office and site teams stay distinct throughout, because design runs on office hours while sites run on daily execution.

Common problems

The company lives in two places at once. Engineering and procurement staff work office hours at the head office, while construction staff work long days on remote sites with no shared biometric. Staff and engineers transfer between projects as jobs start and finish, which breaks reporting lines. Contract labour dominates the site headcount but sits outside the direct hierarchy. Overtime rises near milestones. The steady fixes are site or app-based attendance for project staff, one project manager as reporting manager per site person, and clear records for contract labour beside direct staff.

Set up this structure in ZeniaHR

  1. Add the head office and each project site as a branch, and create departments like Engineering, Procurement, Construction, Tendering, Safety, HR and Finance.
  2. Create designations such as Site Engineer, Design Engineer, Planning Engineer, Construction Manager and Project Manager, and use grades to hold pay bands.
  3. Give every person a reporting manager, the project manager for site staff and the function head for office staff, each with an HR partner.
  4. Use the org chart to fix broken reporting lines when staff move between projects, and confirm no one is left without a manager.
  5. Set a General shift for the head office, and use mobile app punches with a check-in spot per project site where there is no office biometric.
  6. Keep leave, corrections and overtime on the reporting manager then HR route, and add the projects head as a hiring approver above project managers.

See it on your own data

A 30-minute demo on a video call. We set up your departments, shifts and leave rules and show attendance, leave and payroll running for your team. Free for your first 50 employees.

Book a free demoSee pricing

Frequently asked questions

What is the organizational structure of an EPC company?

An EPC company is organized around projects. A managing director leads engineering, procurement, construction, tendering, quality and safety, and support functions. Engineering designs, procurement buys, and construction builds on site, joined by a project manager for each job. Engineering and procurement sit at the head office while construction runs on project sites. Large contractors add business units by sector such as power, water or roads.

Who does a site engineer report to?

A site engineer reports to the construction manager or project manager of their site, who reports to the projects head. For leave and attendance corrections in ZeniaHR, the request goes to the engineer's reporting manager and then to HR. Because a site cannot pause, the project manager plans cover before approving leave, and hiring for the site follows the same upward chain.

How does an EPC company manage head office and site staff?

Engineering and procurement staff work office hours at the head office and punch on a General shift. Construction staff work on project sites with no shared biometric, so they punch on the mobile app with a check-in spot per site. Staff transfer between projects, so reporting lines are updated on the org chart. Leave for both still routes through the reporting manager and then HR.