A mid-sized construction and real estate company, say a 600-staff builder running six project sites across Pune and Nagpur, works in two places: a head office that wins and plans work, and sites that build it. The head office holds projects, planning, procurement, design, safety, sales and the support functions. Each site is run by a project manager with site engineers, supervisors and foremen leading labour. Work moves site to site as projects finish, labour is often on contract, and site attendance and safety records shape the lower levels of the chart.

Org chart

Managing DirectorProjects HeadProject Managerper siteSite EngineerSite SupervisorForemanleads labourPlanning and QS HeadQuantity SurveyorProcurement ManagerPurchase ExecutiveDesign HeadArchitectEHS ManagerHR ManagerAccounts Manager

The project branch is shown in depth, from the projects head to a project manager and the site engineers, supervisors and foremen. Planning, procurement, design, safety, HR and accounts are drawn one level down. Each site repeats the same engineer and foreman pattern.

Levels and designations

LevelTypical designationsSpan of control
L1 LeadershipManaging Director, CEO6 to 8 heads
L2 Function headsProjects Head, Planning and QS Head, Procurement Manager3 to 6 reports
L3 Site leadershipProject Manager, Site Engineer, Planning Engineer6 to 20 staff
L4 SupervisorsSite Supervisor, Foreman, Store In-charge10 to 50 workers
L5 WorkersMason, Bar Bender, Helperno direct reports

Approval chains

RequestApproval chain
LeaveSite Engineer → Project Manager → HR Executive
Attendance correctionSite Supervisor → Project Manager → HR Executive
OvertimeForeman → Site Supervisor → HR Executive
ReimbursementSite Engineer → Project Manager → Accounts Manager
HiringProject Manager → Projects Head → HR Manager

How the structure works

Work is organized by project, not by department. When the company wins a project, a project manager is given a site team drawn from engineering, planning and stores. Site engineers run the technical work for civil, structural and finishing, supervisors run the day-to-day, and foremen lead the labour gangs. The head office supports every site: planning and quantity surveying track cost and progress, procurement buys material, design gives drawings, and a safety function watches site conditions. Because a site closes when the project ends, staff and labour move to the next site, and the reporting manager on record is the project manager of the current site.

How it changes with size

A small contractor may be an owner with a site engineer, a supervisor and contract labour. A mid-sized builder runs several sites at once, a planning and quantity surveying desk, and a procurement team. A large developer adds a projects director over clusters of sites, a contracts and tendering team, a dedicated safety department, and a customer relations team for property buyers. Labour is almost always through contractors and gang leaders, so the structure must track direct staff and contract labour separately while keeping site attendance and safety records complete for everyone on site.

Common problems

Contract labour is the central structural question. Most workers come through a labour contractor, sit outside the direct hierarchy, and change from site to site, yet their attendance, wages and safety must still be recorded. Sites are spread out with no office biometric, so attendance is taken on site or on a phone. Overtime and night pours push hours up. Staff transfers between sites break reporting lines. The way through is site or app-based attendance, one project manager as reporting manager per staff member, and clear records for contract labour alongside direct staff.

Set up this structure in ZeniaHR

  1. Add each project site and the head office as a branch, and create departments like Projects, Planning, Procurement, Design, Safety, HR and Accounts.
  2. Create designations such as Foreman, Site Supervisor, Site Engineer, Quantity Surveyor and Project Manager, and use grades to hold pay bands.
  3. Give every staff member one reporting manager, usually the project manager on the current site, and an HR partner, so leave and corrections route correctly.
  4. Use the org chart to fix broken reporting lines when staff transfer between sites, and confirm no one is left without a manager.
  5. Set up site or mobile app punches with a check-in spot per site, since spread-out sites have no shared office biometric.
  6. Keep leave, corrections and overtime on the reporting manager then HR route, and add the projects head as a hiring approver above project managers.

See it on your own data

A 30-minute demo on a video call. We set up your departments, shifts and leave rules and show attendance, leave and payroll running for your team. Free for your first 50 employees.

Book a free demoSee pricing

Frequently asked questions

What is the organizational structure of a construction company?

A construction company splits into a head office and project sites. The head office holds projects, planning, procurement, design, safety, sales and support. Each site has a project manager over site engineers, supervisors and foremen who lead labour. Work is organized by project, so teams move site to site. Large developers add a projects director and a contracts team above the sites.

Who does a site engineer report to?

A site engineer reports to the project manager of their site, who reports to the projects head. For leave and attendance corrections in ZeniaHR, the request goes to the engineer's reporting manager and then to HR. Because a site cannot pause, the project manager plans cover before approving leave, and hiring for the site follows the same upward chain.

How is attendance managed on construction sites?

Sites are spread out with no shared office biometric, so workers punch at the site or on the mobile app, which can carry GPS location and be limited to a check-in spot per site. Contract labour is recorded alongside direct staff. The finalized attendance month feeds payable days, while overtime and night pour hours are approved before they are paid.