The roster
One row per team, one column per day of the cycle. The cycle then repeats.
| Team | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Team A | D | N | O | D | N | O | D | N | O | D | N | O | D | N | O | D | N | O | D | N | O |
| Team B | N | O | D | N | O | D | N | O | D | N | O | D | N | O | D | N | O | D | N | O | D |
| Team C | O | D | N | O | D | N | O | D | N | O | D | N | O | D | N | O | D | N | O | D | N |
Shifts per 21-day cycle
| Team | Days in the cycle |
|---|---|
| Team A | 7 day, 7 night, 7 off |
| Team B | 7 day, 7 night, 7 off |
| Team C | 7 day, 7 night, 7 off |
How the rotation works
Run a day shift from 7 am to 7 pm and a night shift from 7 pm to 7 am. The three teams roll through day, night and rest: Team A reads DNODNODNO, with Teams B and C one and two steps behind. On every date one team is on days, one on nights and one resting, so the site is covered with three crews. The pattern is shown over 21 days so it lines up neatly, but the real rhythm is a simple three day roll. Because rest is only every third day, the load is high.
- D is the day shift, 7 am to 7 pm.
- N is the night shift, 7 pm to 7 am.
- O is a rest day; rest falls every third day.
- Three teams cover day and night with no spare crew.
Hours per week worked out
Each team works two of every three days on 12 hour shifts. That is 14 shifts in the 21 day cycle, or 168 hours over three weeks, which is 56 hours a week on average. This is well above the eight hour ordinary day and above a 48 hour week, so a large share of the hours is overtime, paid at twice the ordinary wage rate with consent. Check your state limits on daily hours, weekly hours and overtime before running this, and treat it as short term unless you add a fourth crew.
Who the pattern suits
This rota fits only where cover must not drop and headcount is tight: a small security post, a plant covering staff shortages, or a short project. It is simple and needs just three people or crews, but 56 hours a week is heavy and hard to sustain. Add a fourth team to drop to 42 hours as soon as you can. Women may work the night line with their consent and the safety conditions the government sets. Watch fatigue closely and keep every third day rest clear.
Pros
- Covers day and night with only three crews.
- The three day roll is very simple to run.
- Useful as a short term fix during shortages.
- Every third day is a rest day.
Cons
- Averages 56 hours a week, a heavy load.
- A large share of hours is paid overtime.
- Rest only every third day risks fatigue.
- Not suitable as a long term arrangement.
- No spare crew if someone falls sick.
Set it up in ZeniaHR
- In the shift catalogue add the 12 hour day and night shifts with code, timings, break, full and half day hours, grace, and the night flag with a colour.
- Build a rotation template with a three day roll of day, night and rest, shown over 21 days, and stagger the three teams by one day each.
- Assign in bulk over up to 92 days and open the day grid to confirm one day team and one night team appear on every date.
- Set the overtime policy to count the heavy hours beyond full day hours at or above twice the ordinary rate, and set a monthly cap to control the load.
- Use the overtime module nightly detection and manager then HR approval so the extra hours are recorded and paid correctly each cycle.
- Turn on the late and missed punch out alerts so supervisors spot fatigue and gaps quickly on this demanding rota.
Run this roster in ZeniaHR
Build the rotation once, stagger it across teams and let attendance, overtime and payroll follow it. Free for your first 50 employees.
Book a free demoSee pricingFrequently asked questions
How many hours a week is a 3-team 12-hour rotation?
It averages 56 hours a week. Each team works two of every three days on 12 hour shifts, which is 14 shifts in 21 days, or 168 hours over three weeks. That is well above a 48 hour week, so much of it is overtime at twice the ordinary wage rate with consent.
Why is a 3-team rota so heavy?
With three teams and two shifts to fill every day, each crew must work two days in three, leaving little rest. A fourth team lets one crew rest fully, cutting the average from 56 to 42 hours a week. That is why most sites move to four teams when they can.